Marina Bay MRT Station

NS27TE20CE2
Marina Bay
滨海湾 | மரீனா பே
Marina Bay MRT Station – Exit 4
Address 21 Park Street, Singapore 018925 (NSL)
23 Park Street, Singapore 018926 (CCL)
25 Park Street, Singapore 018929 (TEL)
Lines Served   North South Line
  Circle Line
  Thomson-East Coast Line
Operator SMRT Trains (NSL, CCL & TEL)
Structure Underground (All lines)
Platform Island (NSL & CCL)
Stacked Side (TEL)
Opened 4 Nov 1989 (NSL)
14 Jan 2012 (CCL)
13 Nov 2022 (TEL)

Marina Bay MRT Station (NS27/TE20/CE2) is an underground interchange station located in the Downtown Core planning subzone, built alongside Bayfront Avenue. The station connects the North South Line (NSL), the Circle Line (CCL) extension, as well as the Thomson-East Coast Line (TEL). It joined Dhoby Ghaut and Outram Park stations as a three-line interchange station within the MRT network upon the opening of TEL Stage 3 on 13 Nov 2022.

Serving the Marina Bay area, named after the water body it surrounds, Marina Bay station serves limited nearby developments, but will be situated in the heart of the new Central Business District currently being built around it.

Currently the terminus of the Circle Line extension, Marina Bay will be an intermediate stop for the Circle Line once the Circle Line Stage 6 between Marina Bay and HarbourFront stations opens in 2026. In the meantime, both platforms are utilized for train turnarounds. As reflected in the Future Network Map as of March 2020, the station code will change again to NS27TE20CC33 with the opening of Circle Line Stage 6 on 12 July 2026.


First / Last Train Timings
North South Line – (NS27) Marina Bay
Destination First Train Last Train
Weekdays & Sat Sun & Public Holidays Daily
NS28 Marina South Pier 6:05am 6:32am 11:58pm
NS1 Jurong East 6:01am 6:26am 11:50pm
NS7 Kranji 12:06am
Circle Line – (CE2) Marina Bay
Destination First Train Last Train
Weekdays & Sat Sun & Public Holidays Daily
CC6 Stadium 5:59am 6:24am 11:55pm
Thomson-East Coast Line – (TE20) Marina Bay
Destination First Train Last Train
Weekdays & Sat Sun & Public Holidays Daily
TE1 Woodlands North 6:02am 6:22am 12:02am
TE9 Caldecott 12:14am
TE14 Orchard 12:20am
TE29 Bayshore 6:01am 6:21am 12:14am
TE27 Marine Terrace 12:19am
TE22 Gardens by the Bay 12:25am

Note:


Station Layout
L1 Street Level Bus stops, Taxi stand, Pick-up/drop-off point
B1 NSL Concourse Faregates, Ticketing Service Kiosks, Passenger Service Centre (NSL)
CCL-NSL Transfer Link Paid Transfer between NSL & CCL, Passenger Service Centre (CCL), Faregates
CCL Platform C Circle Line (Anticlockwise ↺) via CE1DT16 Bayfront
CCL Platform D Circle Line via CE1DT16 Bayfront
(Alighting only during Circle Line Stage 6 Integration Testing)
Linkway Unpaid Link to Exits 2 & 5, Faregates to CCL / NSL Ticket Concourses
(Former Marina Bay Temporary Maintenance Facility)
TEL Concourse Faregates, Ticketing Service Kiosks, Passenger Service Centre (TEL), Retail Shops
TEL-NSL Transfer Link Paid Transfer between TEL & NSL, Faregates to Exit 5
B2 NSL Platform A North South Line towards NS1EW24 Jurong East
NSL Platform B North South Line towards NS28 Marina South Pier
CCL Concourse Transfer Hall; Faregates to CCL-TEL Unpaid Link
TEL-CCL Transfer Link Paid Transfer between TEL & CCL
TEL-CCL Transfer Link Unpaid Transfer between TEL Concourse & CCL Concourse
B3 TEL-NSL & CCL Link Paid Transfer between TEL & CCL / NSL
B4 TEL Platform E Thomson-East Coast Line towards TE29 Bayshore
B5 TEL Platform F Thomson-East Coast Line towards TE1 Woodlands North

 


Platforms

Marina Bay Station currently has six platforms, with NSL, CCL and TEL each occupying two platforms.

Circle Line (B1):
 Unpaid Link
< to Exit 5 |  ^ Lift & Escalator to CCL Concourse (B2) ^ |  Faregates to NSL Ticket Concourse >
Former Marina Bay Temporary Maintenance Facility [Restricted Area]
MRT_rail (2)
Platform C: Circle Line (Anticlockwise ↺) via CE1DT16 BayfrontCC4DT15 Promenade (→)
Platform D: Circle Line via CE1DT16 BayfrontCC4DT15 Promenade (→)
MRT_rail (2)

The Circle Line platform uses a conventional island platform layout. Refer to the platform display screens for the destination and service information of upcoming trains, as Circle Line services may operate as loop services (from 12 Jul 2026) or terminate at selected stations.

During system integration testing for Circle Line Stage 6 (till 11 Jul 2026), only alighting is allowed at Platform D.

With the platforms at Basement 1 accessible only via the Ticket Concourse / Transfer Hall at Basement 2, Marina Bay CCL station is the first underground MRT station to have its platform level above the concourse level.

CCL platforms were renumbered from A & B to C & D respectively upon the opening of the TEL on 13 Nov 2022.

North South Line (B2):
MRT_rail (2)
Platform A: North South Line towards NS1EW24 Jurong East via NS26EW14 Raffles Place (→)
Platform B: North South Line towards NS28 Marina South Pier (←)
MRT_rail (2)

The North South Line platforms are arranged in a conventional island platform layout.

Thomson-East Coast Line Upper Platform (B4):
MRT_rail (1)
Platform E: Thomson-East Coast Line towards TE29 Bayshore via TE21 Marina South & TE22 Gardens by the Bay (→)
Thomson-East Coast Line Lower Platform (B5):
MRT_rail (1)
Platform F: Thomson-East Coast Line towards TE1 Woodlands North via TE19 Shenton Way (←)

The TEL platforms are arranged in a stacked side configuration. Heading south from Marina Bay station, trains pass through the unopened Marina South station.


Concourse

NSL & TEL ticket concourses are located at Basement 1, while the CCL ticket concourse is located at Basement 2.

Although the Circle Line ticket concourse is at Basement 2, the Circle Line Passenger Service Centre is at Basement 1, next to Exit 2 faregates.


Paid Links
NSL – CCL Paid Link

The former Exit A was reconstructed to allow for a paid link between the NSL and CCL at Basement 1. Near the CCL concourse, the transfer linkway emerges at an atrium where a set of five escalators (3 in paid areas and 2 outside of paid areas) descend to the B2 Transfer Hall, where passengers can ascend to the CCL platforms. Additional faregates at the transfer hall leads to the unpaid link to the TEL Concourse. The CCL – TEL paid link is also located at this level.

TEL – NSL / CCL Paid Link

A transfer level at B3 of the TEL Station connects it with both the NSL & CCL. The NSL-TEL paid link also branches off to Exit 5 with a dedicated remote faregate line and lift lobby at both B1 and B2 level away from the main TEL ticket concourse.

 

Unpaid Link

The former Marina Bay Temporary Maintenance Facility was converted to an unpaid link from 1 November 2023 providing access to Exit 5, CCL Concourse via lifts / escalators at B2 level, as well as faregates to the paid link between CCL & NSL.


Civil Defence Shelter

Marina Bay North South Line station is a designated Civil Defence shelter.

Station Amenities
  • Public toilets at:
    – CCL Concourse (B2)
    – TEL Concourse near Exit 4
    – TEL linkway near Exit 5 (B1)
  • Wheelchair Accessible Toilet & Baby Care room at TEL Concourse Paid Area (B1)
  • ATMs and Self-service Machines at NSL concourse level
  • Bicycle Racks at station exits
Exits

Marina Bay MRT station has five exits leading to ground level. Exit 1 does not offer barrier-free accessibility. Exits 3, 4 and 5 were constructed as part of the Thomson-East Coast Line station.

Exits A & B were renumbered to 2 & 1 respectively when the Thomson-East Coast Line Station opened in November 2022.

Exit Location Nearby
1 Marina Way Asia Square & The Westin Singapore, Central Linear Park, IOI Central Boulevard Towers, Marina Bay Financial Centre, Marina Bay Link Mall, Marina Bay Residences, Marina Bay Suites, Marina One, Marina One Residences, Marina Way, One Raffles Quay, Red Dot Design Museum, The Sail at Marina Bay
2 Bayfront Avenue Asia Square & The Westin Singapore, Central Linear Park, IOI Central Boulevard Towers, Marina Bay Financial Centre, Marina Bay Link Mall, Marina Bay Residences, Marina Bay Suites, Marina One, Marina One Residences, Marina Way, One Raffles Quay, Red Dot Design Museum, The Sail at Marina Bay
3 Bayfront Avenue / Park Street
4 Sheares Avenue
5 Park Street Singapore Chinese Cultural Centre, Singapore Conference Hall

Transport Connections

Marina Bay station connects to several bus stops in the vicinity, as well as taxi stands and passenger pick-up points.

Bus

There are 6 bus stops in the vicinity of Marina Bay station.

Bus Stop Exit Bus Routes
Marina Bay Financial Ctr
(03391) Marina Blvd
1 97, 97e, 106, 133, 400, 513, 651, 653, 654, 655, 657, 661, 666, 667, 668, 670, 671, 672, 673, 674, 675, 676, 677, 678, 679, 982E
Marina Bay Stn
(03539) Central Blvd
1 97, 97e, 106, 133, 400, 502, 502A, 513, 651, 653, 654, 655, 657, 661, 666, 667, 668, 670, 671, 672, 673, 674, 675, 676, 677, 678, 679, 982E
(03551) Bayfront Ave 2 [Bus Stop Not In Use]
(03559) Bayfront Ave 3 [Bus Stop Not In Use]
(03561) Park St 2 [Bus Stop Not In Use]
(03569) Park St 5 [Bus Stop Not In Use]
Road

Taxi stands and pick-up/drop-off points are located next to station exits:

Exit Road Provisions
2 Bayfront Avenue Taxi stand (E40), Pick-up/drop-off point
3 Bayfront Avenue Taxi stand (E41), Pick-up/drop-off point
MRT Bus Bridging Service

In the event of a MRT service disruption affecting Marina Bay station, MRT Bridging Buses may be activated to ply affected stretches of the North South Line, Circle Line or Thomson-East Coast Line. In which case, the buses can be boarded from the following bus stops:

Towards Bus stop Exit
North South Line (NSL Bridging Bus)
NS1EW24 Jurong East Marina Bay Stn
(03539) Central Blvd
1
NS28 Marina South Pier Marina Bay Financial Ctr
(03391) Marina Blvd
1
Circle Line (CCL Bridging Bus)
CC29NE1 HarbourFront Marina Bay Stn
(03539) Central Blvd
1
Thomson-East Coast Line (TEL Bridging Bus)
TE1 Woodlands North
Marina Bay Stn
(03539) Central Blvd
3
TE29 Bayshore
Marina Bay Financial Ctr
(03391) Marina Blvd
3

In addition, passengers can board free regular bus services at Bus Stops 03391 & 03539 when activated.


Passenger Usage Patterns

An interchange station linking the North-South Line with the Circle Line extension, Marina Bay station encounters moderate numbers of transfer passengers between the two lines along with moderate demand from limited surrounding developments. Demand is expected to increase in the future when the new Central Business District develops in the surrounding area.

Between 1989 and 2014, Marina Bay Station was the southern terminus of the North South Line. When Marina South Pier station opened in 2014, it was no longer the line terminus, but a majority of NSL trains terminated there likely owing to low passenger traffic at Marina South Pier. This arrangement was lifted following the implementation of the new CBTC Signalling System in 2017.

Construction

Marina Bay NSL station and tunnels were built as part of Contract 310.

Circle Line Contract 901 for the construction and completion of Marina Bay CCL station was awarded to local company Hock Lian Seng Infrastructure Pte. Ltd. for S$348.4 million in Feb 2008. The scope also includes addition and alteration works to the existing North South Line (NSL) Marina Bay station, localised diversions of the East Coast Parkway and Marina Street as well as demolition of an expunged vehicular underpass.

The Circle Line station was designed by Aedas Architecture. As an integral part of Singapore’s Marina Bay development and an interchange station for two major metro lines, Marina Bay Station is located in a public park. The design aims to integrate the station into the park landscape through landscaping. The translucent ETFE canopy acts as a skylight to allow natural light penetrating deep into the underground hall. To further minimise the visual impact of the station to the surrounding park landscape, only the lift, entrance glazed enclosure, lightweight canopy and reflective pool are visible on street level, giving users full view of the park from the station entrance.

Contract T226 for the construction of Marina Bay station and its associated tunnels was awarded to Taisei Corporation at a contract sum of S$425 million.

The TEL station was originally targeted for completion and opening in Year 2021. However, it was delayed till 2022 as mentioned in the SMRT Operations Review 2020.

Future Developments

Circle Line Stage 6 between HarbourFront and Marina Bay stations is scheduled for completion in 2026. A pedestrian mall network will link the station with adjacent buildings in the future.


Former Marina Bay Temporary Maintenance Facility (MBTMF)

Just beside the Circle Line station is the former Marina Bay Temporary Maintenance Facility (MBTMF) for Downtown Line trains. As Downtown Line Stage 1 (22 Dec 2013 to 26 Dec 2015) was disconnected from the main depot at Gali Batu, the Temporary Maintenance Facility was used to provide for low-level maintenance work for the Bombardier MOVIA C951 rolling stock prior to the opening of Downtown Line Stage 2. In the meantime, trains used the Circle Line’s Kim Chuan Depot for the launching of trains and major maintenance works.

MBTMF was built as part of the Circle Line Extension. Concealed from view behind a concrete partition wall, the facility can be seen from the scissors crossing just north of the station, with a single access track joining the northbound track.

Works to remove the disused tracks leading to the maintenance facility from the Circle Line took place in May 2021. The area was converted to an unpaid link between Exit 5 at the TEL Paid Link, the NSL & CCL ticket concourses, as well as Exit 2, which opened on 1 November 2023.

Former Train Service Arrangements
North South Line

Prior to regular southbound trains being scheduled to turnaround at Marina South Pier, platforms at Marina Bay were used both for train turnarounds and trains heading to/from Marina South Pier. Using a set of points north of the station, terminating trains arriving from Raffles Place arrive at either Platform A or B to before heading back towards Raffles Place and Jurong East. At the same time, passing-through-trains call at Platform B towards Marina South Pier, and at Platform A towards Jurong East.

 


Gallery

Additional Photos at Page 2.


External Links & References

8 thoughts on “Marina Bay MRT Station

  • 29 November 2024 at 10:17 AM
    Permalink

    The station code names are getting weird. Why not station code name for Prince Edward Road change to CC1, Marina Bay to CC2 and Bayfront to CC3? And the station code names for Esplanade change to CC32, Bras Basah to CC33 and Dhoby Ghaut to CC34?

    Reply

Leave a Reply

Your email address will not be published. Required fields are marked *