Shorter operating hours along selected stretches rail lines take effect on selected weekends to facilitate additional engineering hours for various purposes. This involves early closures, late openings, as well as full-day closures.
These closures allow more time for rail maintenance and renewal works to be carried out. These shorter operating hours became prevalent in the wake of the Joo Koon train collision incident in November 2017, to speed up re-signalling works as well as for other purposes.
Early Closures started in 2014 to facilitate SMRT’s rail renewal works, including the replacement of timber sleepers with concrete sleepers, third rail replacement and resignalling.
Additional Engineering Hours
East West Line
The shortened operating hours facilitate additional engineering hours for re-signalling and maintenance work. Beyond April 2018, these additional engineering hours will be used to facilitate replacement of power supply and track circuits.
From November 2020, early closure and late openings on weekends are to facilitate the trip coil replacement on the Tuas West Extension of the East West Line. In addition, power cable replacement would also take place in 2021.
From December 2024, full day closures across multiple days on a stretch of the East West Line facilitate works to integrate the East Coast Integrated Depot with the running tracks.
North South Line
The shortened operating hours facilitate additional engineering hours for intensive railway maintenance and improvement works. These works include replacement of power supply and track circuits in the later half of 2018.
North East Line
The shortened operating hours facilitate additional engineering hours to accelerate maintenance works, such as the replacement of rail crossing and track, and renewing parts of the power and signalling systems.
In June & July 2024, late openings facilitate testing and commissioning works to integrate the new Punggol Coast station to the existing North East Line network.
Sengkang & Punggol LRT
The shortened operating hours facilitate replacement works conducted on the finger joints of concrete plinths, enhanced preventive maintenance on the signalling cables, as well as the asset renewal works which include replacement of the power rail and power rail assemblies.
Bukit Panjang LRT
The full day closures allow more time for maintenance works, such as the replacement of sections of the power rails, track switch components as well as the parts of the doors and propulsion systems of LRT trains as part of the Bukit Panjang LRT Overhaul programme.
Early Closures & the full day closure on October 2023 facilitate ongoing system renewal works for the transition to the Interim Operations Control Centre.
Early Closures in March – June 2024 were to facilitate additional engineering hours for testing of the new vehicles and systems.
Early Closures from November 2024 to October 2025 were to facilitate upgrading of the BPLRT signalling system & testing of the new and retrofitted Light Rail Vehicles on the BPLRT network
Downtown Line
Late Openings on Sundays in 2017 facilitated more time for testing of the entire Downtown Line as an integrated line in preparation for the opening of Downtown Line Stage 3 from Fort Canning to Expo on 21 October 2017.
Thomson-East Coast Line
Early Closures & Late Openings on Fridays, Saturdays & Sundays from 3 April 2020 to 26 July 2020 facilitated additional engineering hours to test the systems and trains in preparation for the opening of TEL Stage 2 in 2021. Several more periods were put in place leading up to the opening of Stage 2. In addition, these were also put in place prior to the opening of TEL Stage 3.
Early Closures & Late Openings on Fridays, Saturdays & Sundays from 3 November 2023 to 26 January 2024 will facilitate the rigorous integrated testing of systems in TEL Stages 1-4, to prepare for the opening of TEL Stage 4 for passenger service in 2024.
Circle Line
Longer Intervals took place on selected days in June & July 2023 to facilitate preventive maintenance and strengthening works along a tunnel segment between Promenade and Nicoll Highway station.
Early Closures on Sundays from 15 October 2023 to 5 November 2023 will facilitate the testing of a new Automatic Train Supervision system.
Single Platform Operations at Telok Blangah and HarbourFront stations from 20 January 2024 to 5 April 2024 (originally planned till 24 May 2024) will facilitate track works to connect the Circle Line HarbourFront station to the new CCL Stage 6 extension.
List of Early Closures & Late Opening
Legend:
EC = Early Closure; LO = Late Opening; SC = Sunday (Full-Day) Closure; FC = Full Day Closure; LI = Longer Train Service Intervals; WC = Weekend Closure
Month | Line(s) | Closure Type | Sector Closed (terminal stations inclusive) |
April 2014 | NSL | EC | Ang Mo Kio—Admiralty |
May 2014 | |||
June 2014 | |||
July 2014 | |||
August 2014 | |||
September 2014 | |||
October 2014 | |||
November 2014 | NSL | EC | Admiralty—Jurong East |
December 2014 | |||
January 2015 | |||
February 2015 | |||
March 2015 | |||
November 2015 | EWL | EC | Bugis—Tanah Merah |
December 2015 | |||
February 2016 | EWL | EC | Joo Koon—Jurong East, Tanah Merah—Pasir Ris |
March 2016 | |||
April 2016 | |||
May 2016 | |||
June 2016 | EWL | EC | Joo Koon—Jurong East, Tanah Merah—Pasir Ris |
EWL, NSL | LO | Queenstown—Joo Koon, Jurong East—Bukit Gombak | |
July 2016 | EWL | EC | Joo Koon—Jurong East, Tanah Merah—Pasir Ris |
EWL, NSL | LO | Queenstown—Joo Koon, Jurong East—Bukit Gombak | |
August 2016 | EWL | EC | Joo Koon—Jurong East, Tanah Merah—Pasir Ris |
EWL, NSL | LO | Queenstown—Joo Koon, Jurong East—Bukit Gombak | |
September 2016 | EWL, NSL | LO | Queenstown—Joo Koon, Jurong East—Bukit Gombak |
October 2016 | EWL, NSL | LO | Queenstown—Joo Koon, Jurong East—Bukit Gombak |
April 2017 | EWL | EC | Lakeside—Joo Koon, Changi Airport Branch Line |
SPLRT, PGLRT | LO | Alternate between loops of Sengkang LRT & Punggol LRT | |
May 2017, June 2017, July 2017, August 2017 |
DTL | LO | Bukit Panjang—Chinatown |
SPLRT, PGLRT | LO | Alternate between loops of Sengkang LRT & Punggol LRT | |
September 2017 | SPLRT | LO | Sengkang LRT East Loop via Ranggung, West Loop via Renjong |
November 2017 | BPLRT | LO | Entire Bukit Panjang LRT |
December 2017 | EWL, NSL | EC, LO, SC | Tiong Bahru—Tuas Link, Jurong East—Bukit Gombak |
BPLRT | LO | Entire Bukit Panjang LRT | |
January 2018 | EWL | EC, LO, SC | Paya Lebar—Pasir Ris, Changi Airport Branch Line |
SPLRT, PGLRT | LO | Alternate between loops of Sengkang LRT & Punggol LRT | |
February 2018 | EWL | EC, LO | Paya Lebar—Pasir Ris, Changi Airport Branch Line |
SPLRT, PGLRT | LO | Alternate between loops of Sengkang LRT & Punggol LRT | |
March 2018 | EWL | EC, LO | Entire East West Line and Changi Airport Branch Line |
SPLRT, PGLRT | LO | Alternate between loops of Sengkang LRT & Punggol LRT | |
April 2018 | EWL | EC, LO | Entire East West Line and Changi Airport Branch Line |
BPLRT | SC | Entire Bukit Panjang LRT Line | |
SPLRT, PGLRT | LO | Alternate between loops of Sengkang LRT & Punggol LRT | |
May 2018 | NSL | EC, LO | Khatib—Novena |
BPLRT | SC | Entire Bukit Panjang LRT Line | |
PGLRT | LO | Punggol LRT East Loop via Damai, West Loop via Sam Kee | |
June 2018 | NSL | EC, LO | Admiralty—Yio Chu Kang |
BPLRT | SC | Entire Bukit Panjang LRT Line | |
SPLRT, PGLRT | LO | Alternate between loops of Sengkang LRT & Punggol LRT | |
July 2018 | NSL | EC | Bukit Gombak—Admiralty |
BPLRT | LO | Entire Bukit Panjang LRT Line | |
SPLRT, PGLRT | LO | Alternate between loops of Sengkang LRT & Punggol LRT | |
August 2018 | NSL, EWL | EC, LO | Bukit Gombak—Jurong East, Dover—Pioneer |
BPLRT | LO | Entire Bukit Panjang LRT Line | |
SPLRT, PGLRT | LO | Alternate between loops of Sengkang LRT & Punggol LRT | |
September 2018 | NSL, EWL | EC, LO | Bukit Gombak—Jurong East, Dover—Pioneer |
BPLRT | LO | Entire Bukit Panjang LRT Line | |
SPLRT, PGLRT | LO | Alternate between loops of Sengkang LRT & Punggol LRT | |
October 2018 | BPLRT | LO | Entire Bukit Panjang LRT Line |
SPLRT | LO | Sengkang LRT East Loop via Ranggung, West Loop via Renjong | |
EWL | EC | Tiong Bahru—Clementi | |
November 2018 | EWL | EC | Pioneer—Tuas Link |
NSL, EWL | EC | Dover—Lakeside, Marsiling—Jurong East | |
December 2018 | NSL, EWL | EC | Dover—Lakeside, Marsiling—Jurong East |
January 2019 | EWL | EC | Raffles Place — Bugis |
NEL | EC | Serangoon—Punggol | |
February 2019 | NEL | EC | Serangoon—Punggol |
March 2019 | NEL | EC | Serangoon—Punggol |
NEL | EC | HarbourFront—Dhoby Ghaut | |
April 2019 | NSL | LI | Orchard—City Hall |
May 2019 | EWL | EC | Bugis—Tanah Merah |
NSL | FC | Admiralty—Sembawang | |
NSL | FC | Admiralty—Yio Chu Kang | |
June 2019 | EWL | EC | Bugis—Tanah Merah |
SKLRT | LO | Sengkang LRT East & West Loops | |
July 2019 | NEL | EC | Serangoon—Punggol |
SKLRT | LO | Sengkang LRT East & West Loops | |
August 2019 | SKLRT | LO | Sengkang LRT East & West Loops |
NSL | LO | Jurong East—Woodlands | |
September 2019 | SKLRT | LO | Sengkang LRT East & West Loops |
NSL | LO | Jurong East—Woodlands | |
NSL | EC | Jurong East—Kranji | |
October 2019 | SKLRT | LO | Sengkang LRT East & West Loops |
EWL | EC | Jurong East—Outram Park | |
SPLRT | EC, LO | Sengkang LRT East & West Loops, Punggol LRT East & West Loops |
|
November 2019 | EWL | EC | Jurong East—Outram Park |
NEL | EC | Serangoon—Punggol | |
December 2019 | EWL | EC | Pasir Ris—Tanah Merah |
PGLRT | EC | Punggol LRT East & West Loops | |
January 2020 | NSL | EC | Ang Mo Kio—Newton |
February 2020 | NSL | EC | Canberra—Ang Mo Kio |
March 2020 | NSL | EC | Canberra—Ang Mo Kio |
April 2020 | TEL | EC, LO | Woodlands North—Woodlands South |
EWL | EC | Aljunied—Tanah Merah | |
May 2020 | TEL | EC, LO | Woodlands North—Woodlands South |
EWL, NSL | EC | [Cancelled] Boon Lay—Buona Vista, Jurong East—Choa Chu Kang | |
June 2020 | TEL | EC, LO | Woodlands North—Woodlands South |
EWL, NSL | EC | [Cancelled] Boon Lay—Buona Vista, Jurong East—Choa Chu Kang | |
July 2020 | TEL | EC, LO | Woodlands North—Woodlands South |
SKLRT | LO | Sengkang LRT East & West Loops | |
August 2020 | TEL | EC, LO | Woodlands North—Woodlands South |
SPLRT | LO | Sengkang LRT East & West Loops, Punggol LRT East & West Loops |
|
September 2020 | TEL | EC, LO | Woodlands North—Woodlands South |
PGLRT | LO | Punggol LRT East & West Loops | |
October 2020 | TEL | EC, LO | Woodlands North—Woodlands South |
BPLRT | SC | Entire Bukit Panjang LRT Line | |
November 2020 | TEL | EC, LO | Woodlands North—Woodlands South |
EWL | EC | Joo Koon—Tuas Link | |
December 2020 | TEL | EC, LO | Woodlands North—Woodlands South |
SPLRT | WC | Sengkang LRT East & West Loops, Punggol LRT East & West Loops |
|
January 2021 | SPLRT | WC | Sengkang LRT East & West Loops, Punggol LRT East & West Loops |
TEL | EC, LO | Woodlands North—Woodlands South | |
February 2021 | PGLRT | WC | Punggol LRT East & West Loops |
TEL | EC, LO | Woodlands North—Woodlands South | |
March 2021 | PGLRT | WC | Punggol LRT East & West Loops |
TEL | EC, LO | Woodlands North—Woodlands South | |
EWL | SC | Boon Lay—Tuas Link | |
April 2021 | TEL | EC, LO | Woodlands North—Woodlands South |
EWL | SC | Boon Lay—Tuas Link / Joo Koon—Tuas Link | |
NEL | EC | Serangoon—Punggol / HarbourFront—Dhoby Ghaut | |
May 2021 | EWL | SC | Joo Koon—Tuas Link |
NEL | EC | [Cancelled] HarbourFront—Dhoby Ghaut | |
SPLRT | WC | Sengkang LRT East & West Loops, Punggol LRT East & West Loops |
|
TEL | EC, LO | Woodlands North—Woodlands South | |
June 2021 | SPLRT | WC | Sengkang LRT East & West Loops, Punggol LRT East & West Loops |
TEL | EC, LO | Woodlands North—Woodlands South | |
July 2021 | SPLRT | WC | Sengkang LRT East & West Loops, Punggol LRT East & West Loops |
TEL | EC, LO | Woodlands North—Woodlands South | |
August 2021 | SPLRT | WC | Sengkang LRT East & West Loops, Punggol LRT East & West Loops |
TEL | EC, LO | Woodlands North—Woodlands South | |
September 2021 | SPLRT | WC | Sengkang LRT East & West Loops, Punggol LRT East & West Loops |
January 2022 | SKLRT | WC | Sengkang LRT East & West Loops |
February 2022 | TEL | LO | Woodlands North—Caldecott |
March 2022 | TEL | LO | Woodlands North—Caldecott |
April 2022 | TEL | LO | Woodlands North—Caldecott |
May 2022 | TEL | LO | Woodlands North—Caldecott |
SPLRT | WC | Sengkang LRT East & West Loops, Punggol LRT East & West Loops |
|
June 2022 | SPLRT | WC | Sengkang LRT East & West Loops, Punggol LRT East & West Loops |
July 2022 | SPLRT | WC | Sengkang LRT East & West Loops, Punggol LRT East & West Loops |
August 2022 | SPLRT | WC | Sengkang LRT East & West Loops, Punggol LRT East & West Loops |
September 2022 | SPLRT | WC | Sengkang LRT East & West Loops, Punggol LRT East & West Loops |
June 2023 | CCL | LI | Nicoll Highway — Dhoby Ghaut / Marina Bay |
July 2023 | CCL | LI | [Cancelled] Nicoll Highway — Dhoby Ghaut / Marina Bay |
August 2023 | BPLRT |
EC | Entire Bukit Panjang LRT Line |
October 2023 | BPLRT | SC | Entire Bukit Panjang LRT Line |
CCL | EC | Dhoby Ghaut / Marina Bay — HarbourFront | |
November 2023 | CCL | EC | Dhoby Ghaut / Marina Bay — HarbourFront |
TEL | EC, LO | Woodlands North — Gardens by the Bay | |
December 2023 | TEL | EC, LO | Woodlands North — Gardens by the Bay |
January 2024 | TEL | EC, LO | Woodlands North — Gardens by the Bay |
March 2024 | BPLRT | EC | Entire Bukit Panjang LRT Line |
April 2024 | BPLRT | EC | Entire Bukit Panjang LRT Line |
May 2024 | BPLRT | EC | Entire Bukit Panjang LRT Line |
June 2024 | BPLRT | EC | Entire Bukit Panjang LRT Line |
NEL | LO | HarbourFront — Punggol | |
July 2024 | NEL | LO | HarbourFront — Punggol |
November 2024 | BPLRT | EC | Entire Bukit Panjang LRT Line |
December 2024 | BPLRT | EC | Entire Bukit Panjang LRT Line |
EWL | FC | Tanah Merah — Tampines | |
January 2025 | BPLRT | EC | Entire Bukit Panjang LRT Line |
February 2025 | BPLRT | EC | Entire Bukit Panjang LRT Line |
March 2025 | BPLRT | EC | Entire Bukit Panjang LRT Line |
April 2025 | BPLRT | EC | Entire Bukit Panjang LRT Line |
May 2025 | BPLRT | EC | Entire Bukit Panjang LRT Line |
June 2025 | BPLRT | EC | Entire Bukit Panjang LRT Line |
July 2025 | BPLRT | EC | Entire Bukit Panjang LRT Line |
August 2025 | BPLRT | EC | Entire Bukit Panjang LRT Line |
September 2025 | BPLRT | EC | Entire Bukit Panjang LRT Line |
October 2025 | BPLRT | EC | Entire Bukit Panjang LRT Line |
Shortened operating hours on a daily basis for the Bukit Panjang LRT Line take effect from 13 January 2019 to facilitate the Bukit Panjang LRT Overhaul.
For more information, click on the individual links to access the dedicated disruption articles for each month.