Pasir Ris Integrated Transport Hub

Pasir Ris Integrated Transport Hub (ITH) is an upcoming bus interchange located at Pasir Ris Town Centre, as part of the Pasir Ris 8 integrated development. Currently under construction, it is targeted for completion in 2028.

Apart from housing a bus interchange, the mixed-use development comprises a retail mall, condominium, town plaza, polyclinic and childcare facilities.

Current interchange: Pasir Ris Bus Interchange

Details:
Name Pasir Ris Bus Interchange
Address 71 Pasir Ris Drive 3, Singapore 519872
BCM Route Package Loyang Bus Package
Anchor Operator Go-Ahead Singapore
Bus Routes TBC
Berths TBC
Rail Connection EW1CR5CP1 Pasir Ris

The Interchange:

Plans for an Integrated Transport Hub (ITH) at Pasir Ris Central were initially surfaced in URA’s Draft Master Plan 2013. In 2017, the HDB-led Remaking Our Heartland initiative announced renewal plans for the town, including the construction of a mixed-use development on the west side of the existing Pasir Ris MRT station, which would include an ITH to replace the existing Pasir Ris Bus Interchange.

The site was tendered out via GLS in late 2018, and awarded by HDB in March 2019. The development, now called Pasir Ris 8, comprises a two-storey retail mall (Pasir Ris Mall), a 487-unit condominium with 7 blocks (Pasir Ris 8), along with a town plaza, bus interchange, polyclinic, and childcare facilities.

The interchange site is bordered by Pasir Ris Drive 3 to the north; Pasir Ris Drive 8 to the west; Pasir Ris EWL station to the east; and Pasir Ris Central to the south.

Based on available diagrams, vehicle ingress/egress routes at Pasir Ris ITH are via a signalised junction along Pasir Ris Drive 3, with backup access along Pasir Ris Drive 8. A dedicated MINDEF bus pick-up and drop-off (PUDO) point will be built north of the existing EWL station, beneath the rail viaducts.

The access route for most commuters would be via a through-block link connecting Pasir Ris ITH Pasir Ris MRT Exit B (EWL). An underground link will also be built at Basement 2, connecting to the underground CRL station.

Targeted for completion in 2028, the new Pasir Ris ITH will take over the existing Pasir Ris Bus Interchange, which sits on land earmarked for future development. The future Cross Island Line (Phase 1, Aviation Park–Bright Hill) is projected to open in 2030, with a further extension to Punggol due to open in 2032.


Interchange facilities:
  • To Be Announced

There were plans to outfit Pasir Ris ITH with electric bus charging infrastructure under Contract BD401 to support new electric buses procured in March 2023, which called for chargers to be installed at bus depots and ITHs. However, the tender concluded with no ITHs selected for charger installation.


Bus Services:
Service Berth Destination Remarks
Berths:

To Be Announced

Exits:

To Be Announced


Gallery

References
See Also

3 thoughts on “Pasir Ris Integrated Transport Hub

  • 5 July 2021 at 6:31 PM
    Permalink

    Does Integrated Bus Interchange Transport Hub connect Pasir Ris MRT Station East-West Line and Cross Island Line?

    Reply
  • 11 April 2019 at 10:45 PM
    Permalink

    I hope the temporary interchange is slightly bigger than the old one

    Reply
    • 1 December 2023 at 10:17 AM
      Permalink

      Its the same though it has end-on berths

      Reply

Leave a Reply to Pubg Cancel reply

Your email address will not be published. Required fields are marked *