Loading Events

« All Events

  • This event has passed.

Post-Circuit Breaker – Resumption of Public Transport Services

2 June 2020

As Singapore exits the Circuit Breaker period on 2 June 2020, public transport levels will largely be restored to pre-Circuit Breaker levels.

Bus Services resuming on 2 June 2020:

Bus Service Route Suspended since
City Direct Bus Service
651 Jurong West Avenue 3 ⇄ Marina Boulevard / Central Boulevard 8 Apr 2020
652 Upper Thomson Road ⇄ Shenton Way / Anson Road 8 Apr 2020
653 Hume Avenue / Hillview Avenue ⇄ Marina Boulevard / Central Boulevard 8 Apr 2020
654 Anchorvale Street ⇄ Shenton Way / Anson Road 8 Apr 2020
655 West Coast Road ⇄ Marina Boulevard / Central Boulevard 8 Apr 2020
656 Canberra Road ⇄ Shenton Way / Anson Road 8 Apr 2020
657 Jurong West Avenue 1 ⇄ Marina Boulevard / Central Boulevard 8 Apr 2020
660 Buangkok Green ⇄ Shenton Way / Anson Road 8 Apr 2020
661 Pasir Ris Drive 3 ⇄ Marina Boulevard / Central Boulevard 8 Apr 2020
663 Yishun Avenue 6 ⇄ Shenton Way / Anson Road 8 Apr 2020
665 Marsiling Drive ⇄ Shenton Way / Anson Road 8 Apr 2020
666 Punggol Drive ⇄ Marina Boulevard / Central Boulevard 8 Apr 2020
667 Clementi Avenue 4 ⇄ Marina Boulevard / Central Boulevard 8 Apr 2020
668 Ang Mo Kio Avenue 5 ⇄ Marina Boulevard / Central Boulevard 8 Apr 2020
670 Yishun Avenue 7 ⇄ Marina Boulevard / Central Boulevard 8 Apr 2020
671 Punggol Road ⇄ Marina Boulevard / Central Boulevard 8 Apr 2020
672 Hougang Street 51 ⇄ Marina Boulevard / Central Boulevard 8 Apr 2020
Express Bus Services
10e
Bedok Road ⇄ Shenton Way / Anson Rd 8 Apr 2020
12e
Pasir Ris ↔ Kampong Bahru 15 Apr 2020
14e Bedok North Avenue 3 ⇄ Orchard Road 15 Apr 2020
30e Bedok ⇄ Pasir Panjang Road 15 Apr 2020
43e
Punggol ⇄ Marine Parade Road 15 Apr 2020
74e Hougang Central ⇄ Buona Vista 15 Apr 2020
89e Hougang Central ⇄ Airport Cargo Road / Airline Road 15 Apr 2020
97e Jurong East ⇄ Marina Centre 8 Apr 2020
151e Hougang Central ⇄ Kent Ridge 15 Apr 2020
167e Sembawang ↔ Shenton Way / Anson Road 8 Apr 2020
174e Boon Lay ⇄ Kampong Bahru 8 Apr 2020
188e Choa Chu Kang → HarbourFront 15 Apr 2020
196e
Marine Parade Road ⇄ Shenton Way / Anson Road 8 Apr 2020
502 Soon Lee Depot ↺ Central Boulevard 8 Apr 2020
502A
Soon Lee Depot → Central Boulevard (Downtown Stn) 8 Apr 2020
506 Jurong East ↔ Upper East Coast 15 Apr 2020
513 Tampines Avenue 5 ⇄ Shenton Way / Anson Road 8 Apr 2020
518
Pasir Ris ↺ Bayfront Avenue 8 Apr 2020
518A Pasir Ris → Bayfront Avenue (Bayfront Stn Exit A) 8 Apr 2020
850E
Yishun Street 41 / Yishun Ring Rd ⇄ Shenton Way / Anson Road 8 Apr 2020
851e Yishun ⇄ New Bridge Road / Eu Tong Sen Street 8 Apr 2020
854e Yishun → Bedok 15 Apr 2020
868E Bukit Batok West Avenue 5 (Blk 347) → Temasek Avenue (Promenade Stn) 8 Apr 2020
951E Woodlands Street 82 ⇄ Shenton Way / Anson Road 8 Apr 2020
960e Woodlands ↔ Marina Centre 15 Apr 2020
963e Woodlands ⇄ HarbourFront 15 Apr 2020
971E Bukit Panjang Temporary Bus Park ⇄ Cecil Street / Anson Road 8 Apr 2020
982E Choa Chu Kang Avenue 5 ⇄ Marina Boulevard / Central Boulevard 8 Apr 2020

Bus services with recreational demand and cross-border services will continued to be suspended, while Bus Service 128 has been withdrawn.


Train Services

Main article: Singapore COVID-19 Circuit Breaker Measures – MRT & LRT Early Closures & Reduced Frequencies

The frequency of train services across the rail network would be reinstated to pre-circuit breaker levels:

Train Line Train Frequencies
Peak Periods Off-Peak Periods
North South Line No more than 3 mins Around 5 mins
East West Line
North East Line
Circle Line
Downtown Line
Thomson-East Coast Line Around 7 mins Around 12 mins

Last train timings for all lines will also be reinstated.

Train service on the Sengkang-Punggol LRT line, formerly operating a single loop service during off-peak hours, will be reinstated to full-day dual-loop operation.

There will be no change to Bukit Panjang LRT services, with Service A (via Senja) only operating during weekday peak hours since 1 December 2019 as part of the Bukit Panjang LRT Overhaul.


Details

2 thoughts on “Post-Circuit Breaker – Resumption of Public Transport Services”

  • 4 June 2020 at 6:54 AM
    Permalink

    927 already operate since 3/6/2020

    Reply
    • 10 June 2020 at 6:09 PM
      Permalink

      927 is not exempted. Same for 138.

      Reply

Leave a Reply

Your email address will not be published. Required fields are marked *