The Loyang Bus Package is one of fourteen bus packages under the Bus Contracting Model (BCM).
| Incumbent | Go-Ahead Singapore |
| Present Contract Term | Tendered Package 1st Term (Contract PT201): From 4 Sep 2016 (2 year contract extension option exercised; Additional contract extensions of 3 + 4 years) |
| Bus Services | 2, 3, 6, 12, 12e, 15, 17/17A, 34, 36, 43, 43e, 44, 62, 68, 82, 83, 84G/84W, 85, 104, 118, 119, 136, 354, 358, 359, 381, 382G/382W, 384, 386, 403, 459, 518/518A, 661, 666, 673, 678 & 683 (37 bus routes) |
| Bus Depot | Loyang Bus Depot |
| Bus Interchanges | Pasir Ris Bus Interchange, Punggol Bus Interchange, Punggol Coast Bus Interchange |
Under the BCM, bus routes are bundled into bus packages, consisting of a single bus depot, several bus interchanges/terminals, the bus routes and the buses themselves. With all bus infrastructure belonging to the Government, the Land Transport Authority (LTA) would contract out the bus package, select a bus operator (through a competitive tendering process), and lease these assets to the new operator.
The successful tenderer operates these bus routes and collects fares on behalf of LTA, while maintaining the associated bus infrastructure (buses & onboard equipment, depots, interchanges & terminals). In return, the operator is awarded an operating fee from LTA and potential bonuses via an incentive framework.
Go-Ahead Singapore is presently the incumbent operator of the Loyang Bus Package.
In 2030, the bus package is slated to operate out of the new Lorong Halus Bus Depot.
PT201 – Loyang Bus Package (Present Term: 2016 to 2030):
First announced on 11 March 2015, the Loyang Bus Package is the second set of public bus services to be put up for tender under the Bus Contracting Model, following the Bulim Bus Package. This package (when tendered out) comprised of 25 bus services originating from Changi Airport Bus Terminal, Changi Village Bus Terminal, Pasir Ris Bus Interchange, and Punggol Bus Interchange.
In November 2015, the Go-Ahead Group was announced as the successful tenderer of the Loyang Bus Package, who would receive an estimated total fee of $497.7 million over five years. The 25 bus routes would be based out of the then-newly-built Loyang Bus Depot, located off Loyang Way, which was completed in June 2015 and able to accommodate about 500 buses. Go-Ahead Singapore gradually took over all bus routes in two tranches: on 4 September 2016 and 18 September 2016.
The package started with about 400 buses when implemented, and is expected to grow to about 500 buses in 2021 in tandem with new developments and projected growth in ridership.
Multiple contract extensions were later granted by LTA, with the latest extension taking the contract duration to about 14 years, compared to the initial 5 year firm term.
Contract Details:
| Contract PT201: Bus Contracting – Loyang Bus Package | |
| Awarded Operator | Go-Ahead Singapore (Go Ahead Singapore Pte Ltd; formerly known as Go Ahead Loyang Pte Ltd) |
| Duration | Five years; 2-year extension option exercised 3-year extension awarded in September 2022 4-year extension disclosed in October 2026 (effective September 2026) |
| Key Dates | Tender Published 15 Apr 2015 Closed 14 Aug 2015 Awarded 23 Nov 2015 Option Contract Extension announced on 26 Aug 2020 Second Contract Extension mentioned in September 2022 Third Contract Extension disclosed in October 2026 (effective September 2026) |
| Commenced Operations | 04 Sep 2016 (Tranche 1) – 13 bus routes 18 Sep 2016 (Tranche 2) – 11 bus routes 12 Mar 2017 – Service 381 28 Jan 2018 – Service 12e 01 Apr 2018 – Service 68 02 Jan 2019 – City Direct 661 09 Sep 2019 – Service 43e 02 Mar 2020 – City Direct 666 27 Dec 2020 – Service 384 14 Oct 2024 – City Direct 673 2 Jan 2025 – City Direct 678 26 Oct 2025 – Service 104 10 Nov 2025 – Service 44 15 Dec 2025 – City Direct 683 27 Apr 2026 – Service 459 |
| Bus Services | 2, 3, 6, 12, 12e, 15, 17/17A, 34, 36, 43, 43e, 44, 62, 68, 82, 83, 84G/84W, 85, 104, 118, 119, 136, 354, 358, 359, 381, 382G/382W, 384, 386, 403, 459, 518/518A, 661, 666, 673, 678 & 683 (37 bus routes) |
| Anchor Bus Depot | Loyang Bus Depot |
| Anchor Bus Interchange / Terminal | Pasir Ris Bus Interchange, Punggol Bus Interchange (previously Punggol Temporary Bus Interchange), Punggol Coast Bus Interchange |
Bidding Process:
When the tender closed on 14 Aug 2015, 10 transport operators had submitted their various bids. These operators were:
| Name of Tenderer | Base Tender Amount (Price for 5-Years) |
| The Go Ahead Group Plc | $497,738,104.00 |
| Woodlands Transport Holdings Pte. Ltd. | $532,483,542.00 |
| Keolis SA | $535,237,280.00 |
| SBS Transit Ltd | $545,902,389.00 |
| Tian San Shipping (Private) Limited / Kumho Construction & Engineering (H.K.) Limited Consortium | $569,887,777.37 |
| SMRT Buses Ltd | $598,130,218.00 |
| RATP Dev Transdev Asia | $603,718,025.62 |
| Busways Group Pty Ltd | $631,382,714.00 |
| Jiaoyun Group Corporation and Travel GSH Pte Ltd Consortium | Not Shortlisted |
| Kok Tong Transport & Engineering Works Pte Ltd and Jinan Public Transportation Corporation Consoritum | Not Shortlisted |
Among the tender requirements was one that required operators to have a proven track record of operating a fleet of at least 250 buses. Such a requirement would result in joint bids.
As of 12 October 2015, LTA shortlisted 8 bids for this tender. Joint Bids from Jiaoyun Group Corporation with Travel GSH, as well as Kok Tong Transport & Engineering Works with Jinan Public Transportation Corporation were dropped out in the running for this tender.
Contract Award:
On Monday, 23 November 2015, LTA announced The Go-Ahead Group Plc as the winner of the Loyang Bus Package. The evaluation was conducted through a two-envelope process which included quality and price factors, with greater weightage given to the quality proposals submitted by tenderers. The LTA press release sums it well:
Go-Ahead is awarded the contract as it has the highest combined total score for both quality and price evaluation. In its tender submission, Go-Ahead demonstrated a thorough understanding of ground conditions and strong ability in developing strategies to manage specific scenarios for each bus route. The company also displayed strong competence in bus service scheduling to enable the optimal deployment of buses and resources. At the same time, Go-Ahead also emphasised in its proposal a stringent maintenance regime for bus assets and infrastructure. A robust bus-to-technician ratio and strict quality control processes will also be put in place to ensure high maintenance standards. In terms of manpower development, Go-Ahead has comprehensive plans to attract and retain bus captains, with a strong focus on growing the local workforce, training and developing employees, as well as offering career progression opportunities to all levels of staff.
Contract Extensions:
First Extension: 2021–2023
On 26 August 2020, Go-Ahead Group announced a two-year extension from September 2021 to September 2023, exercising the extension option under the original contract. The group attributed the extension to strong operational performance.
Second Extension: 2023–2026
LTA granted a further three-year extension to 2026 in 2022, taking the contract beyond its original five-year term and two-year extension option. The extension was mentioned in September 2022 in a LinkedIn post by Go-Ahead Group executive Louis Rambaud.
The Straits Times reported the extension on 31 October 2022. Responding to press queries, LTA cited COVID-19’s impact on tendering timelines and delays in replacing existing bus depots. These reasons were provided in response to media enquiries, rather than through a standalone LTA announcement. Go-Ahead Singapore subsequently linked to the report from its website’s press release section.
The written parliamentary reply dated 6 October 2026 expanded on the earlier explanation. MOT stated that COVID-19-related market uncertainty could have led operators to include substantial risk premiums in their bids, explaining why LTA extended the contract rather than retendering it at that time.
Third Extension: 2026–2030
The further extension to 2030 only became public through the written parliamentary reply dated 6 October 2026. MOT explained that LTA negotiated the extension to avoid unnecessary relocation costs, following the finalisation of plans to relocate the package to the upcoming Lorong Halus Bus Depot in 2030.
MOT also explained that extensions require LTA Board approval and satisfactory incumbent performance. Terms are renegotiated using prevailing operating costs and service-fee benchmarks from comparable bus contracts, while service standards are typically reviewed. The extension fees were not disclosed on grounds of commercial sensitivity.
Bus Services
Loyang Bus Package consists of a total of 37 bus services, 24 of which were previously operated by SBS Transit. Other bus services were added to the bus package during the contract term.
| Service | Route | Type |
| 2 | Changi Village ↔ Kampong Bahru | Trunk |
| 3 | Tampines ↔ Punggol | Trunk |
| 6 |
Pasir Ris ↺ Loyang Crescent | Trunk |
| 12 |
Pasir Ris ↔ Kampong Bahru | Trunk |
| 12e | Pasir Ris ↔ Kampong Bahru | Express |
| 15 | Pasir Ris ↺ Marine Parade Road | Trunk |
| 17 | Pasir Ris ↔ Bedok | Trunk |
| 34 | Punggol Coast ↺ Changi Airport Terminal 2 | Trunk |
| 36 | Changi Airport Terminal 2 ↺ Tomlinson Road | Trunk |
| 43 | Punggol ↔ Upper East Coast | Trunk |
| 43e | Punggol ⇄ Marine Parade Road | Express |
| 44 | Punggol Coast ⇄ Airport Boulevard | Trunk |
| 62 | Punggol ↺ Sims Avenue | Trunk |
| 68 | Pasir Ris ↺ Tampines | Trunk |
| 82 | Punggol ↺ Serangoon Central | Trunk |
| 83 | Punggol ↺ Sengkang | Trunk |
| 84G | Punggol ↺ New Punggol Road | Trunk |
| 84W | Punggol ↺ New Punggol Road | Trunk |
| 85 | Punggol ↔ Yishun | Trunk |
| 104 | Punggol Coast ↔ Woodleigh | Trunk |
| 118 | Punggol ↔ Changi Business Park | Trunk |
| 119 | Punggol ↺ Hougang Street 21 | Trunk |
| 136 | Ang Mo Kio ↔ Punggol | Trunk |
| 354 | Pasir Ris ↺ Jalan Loyang Besar | Feeder |
| 358 | Pasir Ris ↺ Pasir Ris Drive 10 & Pasir Ris Street 41 | Feeder |
| 359 | Pasir Ris ↺ Pasir Ris Street 71 & Pasir Ris Drive 2 | Feeder |
| 381 | Punggol ↔ Punggol Coast | Feeder |
| 382G | Punggol ↺ Sumang Walk | Feeder |
| 382W | Punggol ↺ Sumang Walk | Feeder |
| 384 |
Punggol ↺ Northshore Drive | Feeder |
| 386 | Punggol ↺ Punggol Central | Feeder |
| 403 | Pasir Ris ↺ Pasir Ris Road | Trunk |
| 459 | Punggol Central ⇄ Upper Paya Lebar Road | Trunk |
| 518 | Pasir Ris ↺ Bayfront Avenue | Express |
| 661 |
Pasir Ris Drive 3 ⇄ Marina Boulevard / Central Boulevard | City Direct |
| 666 |
Punggol Drive ⇄ Marina Boulevard / Central Boulevard | City Direct |
| 673 |
Punggol Way ⇄ Temasek Boulevard | City Direct |
| 678 | Punggol Central ⇄ Temasek Boulevard | City Direct |
| 683 | Punggol Central ⇄ Moulmein Road | City Direct |
Notes:
- Feeder Services 382G & 382W are counted as one service (382).
- Services 84G & 84W are counted as one service (84).
Short Trip & Supplementary Bus Services
These services do not add to the overall service count.
| Service | Route | Type |
| 2B | Changi Village → New Upper Changi Road (Bedok Stn Exit A) | Short Trip |
| 3A |
Tampines → Pasir Ris Drive 12 (Blk 747A) | Short Trip |
| 15A | Pasir Ris → Jalan Eunos (Opp Eunos Stn) | Short Trip |
| 17A | Bedok → Bedok North Avenue 4 (SBST Bedok Nth Depot) | Short Trip |
| 34A | Punggol Coast → Tampines Avenue 5 (Opp Our Tampines Hub) | Short Trip |
| 34B | Tampines Avenue 10 (IKEA Tampines/Aft TPE) → Tampines Avenue 10 (Tampines Wafer Fab Pk) via Changi Airport | Short Trip |
| 36A | Changi Airport Terminal 2 → Tomlinson Road (Aft Cuscaden Rd) | Short Trip |
| 36B | Marine Parade Road (Lagoon View) → Siglap Road (Bef Seaside Residences) | Short Trip |
| 36T | Changi Airport Terminal 2 ↺ Tomlinson Road | Terminating Trip |
| 43A | Punggol Int → Serangoon Central (S’goon Stn Exit C/Blk 201) | Short Trip |
| 62A | Punggol → Aljunied Road (Aljunied Stn) | Short Trip |
| 68A |
Tampines Avenue 11 (Bef Tampines Nth Dr 1) → Tampines | Short Trip |
| 68B |
Tampines → Tampines Avenue 11 (Aft Tampines Nth Dr 1) | Short Trip |
| 83T | Punggol → Sengkang | Terminating Trip |
| 85A |
Yishun → Sengkang East Road (Sengkang Community Hub) | Short Trip |
| 118A | Punggol → Simei Avenue (ITE Coll East Adm Blk) | Short Trip |
| 118B | Simei Avenue (Opp ITE Coll East Adm Blk) → Tampines Expressway (Bef Punggol Rd) | Short Trip |
| 358T | Pasir Ris ↺ Pasir Ris Drive 10 & Pasir Ris Street 41 | Terminating Trip |
| 359T | Pasir Ris ↺ Pasir Ris Street 71 & Pasir Ris Drive 2 | Terminating Trip |
| 382A | Punggol → Sumang Lane (Blk 226A) | Short Trip |
| 386A | Punggol → Edgedale Plains (Blk 682A) | Short Trip |
| 518A | Pasir Ris → Bayfront Avenue (Bayfront Stn Exit A) | Short Trip |
Bus Models
Go-Ahead Singapore operates a fleet of the following bus models under the Loyang Bus Package (PT201):
They initially announced that they would have 363 buses in their fleet during the Loyang Bus Carnival.
Single Deck Buses
Double Decker Buses
Former Trial Buses
Transition Dates:
To ensure a smooth transition with minimal inconvenience to commuters, the Loyang package under the Bus Contracting model was implemented in two tranches in September 2016. Spaced two weeks apart, the two tranches would hand Go-Ahead Singapore progressive control over Punggol, followed by Pasir Ris.
The implementation dates of the two tranches are as follows:
| Tranche | Implementation Date | Bus Services | No. of Routes |
| 1 | 04 Sep 2016 | 3, 34, 43/43M, 62, 82, 83, 84, 85, 118, 119, 136, 382G/382W, 386 | 13 |
| 2 | 18 Sep 2016 | 2, 6, 12, 15, 17/17A, 36, 354, 358, 359, 403, 518/518A | 11 |
| – | 12 Mar 2017 | 381 | 1 |
| – | 28 Jan 2018 | 12e | 1 |
| – | 01 Apr 2018 | 68 | 1 |
| – | 02 Jan 2019 | 661 | 1 |
| – | 09 Sep 2019 | 43e | 1 |
| – | 02 Mar 2020 | 666 | 1 |
| – | 27 Dec 2020 | 384 | 1 |
| – | 14 Oct 2024 | 673 | 1 |
| – | 2 Jan 2025 | 678 | 1 |
| – | 26 Oct 2025 | 104 | 1 |
| – | 10 Nov 2025 | 44 | 1 |
| – | 15 Dec 2025 | 683 | 1 |
| – | 27 Apr 2026 | 459 | 1 |
Scope of Operations:
As part of the tender, the awarded operator would be required to fulfill responsibilities as such:
- Operate bus services under the bus package in accordance with specified EWT performance standards
- Operate and maintain the buses and their onboard equipment provided by LTA
- Operate and maintain the allocated Anchor Bus Interchanges & Bus Depot, including all equipment and systems provided therein
- Charge and collect the fares approved by the Public Transport Council, on behalf of the Government
- Provide bus service information at all bus stops and bus interchanges served by the bus services under the package
- Provide customer management services, such as lost and found service, and a hotline for commuter feedback and enquiries.
Loyang Bus Package (PT201) Timeline
- 2015 (11 Mar): Loyang Route Package announced
- 2015 (15 Apr): Tender opens, closing on 14 Aug 2015 1200hrs.
- 2015 (14 Aug): Tender closes with 10 bids
- 2015 (12 Oct): 8 Bids shortlisted
- 2015 (23 Nov): Contract awarded to The Go Ahead Group Plc
- 2015 (11 Dec): Loyang Bus Depot officially handed over to Go-Ahead Singapore
- 2016 (04 Sep): First tranche of operations rollout
- 2016 (18 Sep): Second tranche of operations rollout
- 2017 (12 Mar): Bus Service 381 added to Bus Package
- 2018 (28 Jan): Bus Service 12e added to Bus Package
- 2018 (12 Mar): Short Trip Service 2A added to Bus Package
- 2018 (01 Apr): Commencement of Bus Service 68
- 2018 (29 Oct): Short Trip Bus Service 386A added to Bus Package
- 2019 (02 Jan): City Direct 661 added to Bus Package
- 2019 (25 Mar): Short Trip Bus Services 34B & 85A added to Bus Package
- 2019 (01 Jul): Short Trip Bus Service 382A added to Bus Package
- 2019 (09 Sep): Express Bus Service 43e added to Bus Package
- 2019 (18 Nov): Short Trip Bus Services 68A & 68B added to Bus Package
- 2020 (02 Mar): City Direct 666 added to Bus Package
- 2020 (08 Apr): Bus Services 661, 666, 518 & 518A temporarily suspended due to Singapore COVID-19 Circuit Breaker Measures.
- 2020 (15 Apr): Bus Services 12e & 43e temporarily suspended due to Singapore COVID-19 Circuit Breaker Measures.
- 2020 (02 Jun): Resumption of Bus Services 12e, 43, 518, 518A, 661 & 666
- 2020 (12 Jul): Bus Service 359 (East Loop) amended to loop at Pasir Ris Drive 2
- 2020 (26 Aug): 2 year contract extension granted to Go-Ahead Singapore till September 2023
- 2020 (27 Dec): Bus Service 384 added to Bus Package
- 2021 (15 Sep): Bus Services 12e, 43e, 518, 518A, 661 & 666 temporarily suspended due to the impact of COVID-19 on available manpower
- 2021 (25 Sep): Resumption of Bus Services 518 & 518A
- 2022 (03 Feb): Resumption of City Direct 661 & 666
- 2022 (Sep): 3 year contract extension granted to Go-Ahead Singapore till September 2026
- 2023 (25 Sep): Short Trip Service 2B added, while Service 2A removed from the bus package
- 2024 (23 Jun): Amendment of Service 84 to be divided into Services 84G & 84W
- 2024 (16 Aug): Short Trip Service 84A added
- 2024 (14 Oct): City Direct 673 added
- 2025 (02 Jan): City Direct 678 added
- 2025 (12 Apr): Short Trip Service 84A withdrawn
- 2025 (27 Apr): Opening of Pasir Ris Integrated Transport Hub
- 2025 (29 Jun): Opening of Punggol Coast Integrated Transport Hub
- 2025 (26 Oct): New Bus Service 104 added; Supplementary Bus Service 43M withdrawn
- 2025 (10 Nov): New Bus Service 44 added
- 2025 (15 Dec): New City Direct Bus Service 683 added
- 2026 (22 Mar): Short Trip Service 43A added
- 2026 (27 Apr): New Bus Service 459 added
- 2026 (07 Oct): 4-year contract extension disclosed in a reply to a Parliamentary Question to 2030; Likely to have taken effect in September 2026
Related Posts:
- Loyang Bus Package Commencement Dates Announced
- Go Ahead prepares for launch day
- Go Ahead Singapore Bus Carnival
External Links & References:
- LTA – Second Bus Package Under The Government Contracting Model
- Singapore bus contract extension – Go-Ahead Group
- LinkedIn Post by Louis Rambaud, Group Strategy & Transformation Director, Go-Ahead Group PLC
- Extension of Loyang Bus Package Contract Versus Retendering – Ministry of Transport [6 Oct 2026]
Back to Bus Contracting Model

Since Go-Ahead experience in operating rail why not LTA award them one rail line for a period of 7 years and option to extend 3 more years for good performance?
Bus Contracting need to extend 7 years and 3 years more for good performance.Let them retain Loyang and award them one more package like Sengkang-Hougang or Seletar in future.Can let multi-modal operators like RATP,KEOLIS or BVG to replace TTS.
Go Ahead should have at least bid for 505million else they won’t be so miserably earning less..
Will there be bus services going through Flora drive? Many new developments there, soon maybe private shuttle bus can no longer accommodate the residents there.
Is Go-Ahead Singapore bus coming to Bukit Batok & Jurong East
Maybe, if it wins Seletar Bus Package. Service 852 serves Bukit Batok.
Hi will 17A be excluded or cancelled cuz it operates from Bedok North Depot?
Hi, Bus Service 17A is included in the Loyang Bus Package. Buses will continue to start and terminate their trips at the bus stop outside SBS Transit Bedok Bus Park.